Ready to deploy

Engineered containers, matched to any engine-alternator configuration

ISO-container packaging integrates the generator package into a protected, transportable unit that simplifies logistics, speeds installation, and performs consistently in demanding environments.

Air & exhaust

Engineered for flow, noise, and compliance

Intake protection, attenuators, and outlet chimneys manage cooling airflow and noise, while exhaust systems—including SCR options—help control emissions for site and regulatory requirements.

Fuel you can trust

Clean supply, stable storage

Base and day tanks keep fuel available where the generator needs it, while polishing improves fuel quality so engines start reliably and injectors stay protected.

Waste heat, reused

Ready before you need it

Heating module is delivered as a factory-assembled skid — pump, electric heating elements, non-return valves, insulated piping and a control panel — that pre-heats the HT and LT circuits independently, each to its own setpoint, while the set is stopped.

Control & protection

Panels, auxiliaries, and verified loading

Auxiliary MCC cabinets coordinate peripheral loads, breaker panels protect the main output path, and load banks validate performance when real site loading is limited or unavailable.

About Our Company

Engineered. Manufactured. Integrated

Auxiliary Systems & Containerized Solutions for Power Generation
From individual auxiliary equipment to fully integrated generator containers, AXON Technic designs, manufactures and integrates complete solutions for power generation applications.
Engineering Expertise

We design integrated systems that match site conditions, compliance needs, and long-term operational goals.

Safety & Compliance

From fuel handling to emissions and electrical protection, we prioritize safe operation and regulatory alignment.

Reliable Performance

Our solutions are built to support continuous and emergency power applications with dependable results.

Turnkey Integration

We combine mechanical and electrical subsystems into one coordinated package for faster deployment and cleaner execution.

Our Products