AXON auxiliary MCC cabinets control and protect all auxiliary equipment of a generator plant, such as fans, pumps, ventilation, lighting and heaters, from one place.
Each cabinet is made for its project and works together with the generator controls, the circuit breaker panels and the building or plant control system, for indoor and outdoor installations.