In Short
AXON Technic designs and builds containers for power generators: ISO-based and purpose-built enclosures that carry the generator set with its air, exhaust, fuel and electrical systems, ready for data centers, industry and power plants.
AXON designs and builds containers for diesel and gas generator sets. The generator is either selected by AXON as part of the project or supplied by the customer and integrated into the container at AXON.
Each container is made for its project and its site, with the sound level, the ventilation and the fuel, exhaust and electrical systems the generator needs, as a purpose-built enclosure or a converted shipping container.