In Short
AXON Technic manufactures generator belly tanks, the fuel tanks built into the base frame of a generator set. A belly tank gives the set its own fuel reserve in the most compact way, so the package travels, lifts and runs as one unit.
A belly tank is a fuel tank built into the base frame of the generator set. It stores the fuel directly under the engine, saves space and keeps the generator supplied for standby, prime and continuous duty.
AXON builds every belly tank for its own generator and project, with the safety and monitoring equipment the site needs.