Auxiliary Equipments for Power Generators & Integrated Solutions

Our scope covers a comprehensive range of auxiliary systems and integrated solutions for power generation applications, engineered to complement and seamlessly integrate with our customers’ generator sets, regardless of engine brand, generator configuration, or project requirements.

We provide solutions covering fuel storage, supply and treatment systems; exhaust and emissions control; air intake and discharge systems; cooling and heat recovery; electrical distribution and control; and complete containerized power solutions.

Our product and system portfolio includes:

  • Belly Tanks
  • Daily Fuel Tanks
  • Fuel Polishing Systems
  • Oil Supply Systems
  • Exhaust Gas Systems with SCR
  • Exhaust Gas Systems without SCR
  • Air Outlet Chimneys
  • Air Inlet & Outlet Attenuators
  • Air Inlet Hoods
  • Containers & Acoustic Enclosures
  • Complete Containerization Solutions
  • Gas Heat Modules
  • Gas Heat Recovery Systems
  • Auxiliary MCC Cabinets
  • Circuit Breaker Panels
  • Dummy Load Banks

 

From individual auxiliary components to fully engineered and integrated containerized power solutions, our systems are designed, manufactured, assembled, and tested to ensure reliable operation under demanding and continuous-duty conditions.

By combining mechanical, thermal, acoustic, fuel, exhaust, and electrical systems within a single engineering approach, we provide our customers with a single-source solution for generator auxiliary systems and complete power generation packages.

Who We Are

Karcioglu Group is a diversified industrial group with decades of experience across engineering, manufacturing, construction, and industrial solutions. With an annual turnover exceeding EUR 70 million and a workforce of more than 750 employees, the Group has built a strong industrial presence and extensive capabilities across multiple sectors. Through its companies AXON, TECS, TERMOKAR, KARMAK, and KAR CONSTRUCTION, Karcioglu Group delivers innovative and reliable solutions to customers across a wide range of industries worldwide.

Operating in sectors including power generation, heat transfer technologies, industrial manufacturing, construction, infrastructure, and turnkey engineering, Karcioglu Group combines the expertise and capabilities of its companies to provide integrated, high-quality solutions tailored to complex industrial requirements.

With a strong commitment to engineering excellence, quality, innovation, and customer satisfaction, the Group manages the entire project lifecycle—from design and manufacturing to installation, commissioning, and after-sales support. Backed by modern production facilities and experienced engineering teams, Karcioglu Group continues to be a trusted partner for critical industrial projects around the world.

AXON Technic

OTHER GROUP COMPANIES

TECS RADIATORS

TECS Engineering is a leading manufacturer of advanced heat transfer and cooling solutions for power generation and industrial applications. Specializing in dry coolers, HT/LT radiator systems, charge air coolers, and customized thermal management equipment, TECS delivers reliable, high-performance solutions engineered to meet the demanding requirements of diesel and gas engine installations worldwide.

TERMOKAR

Termokar heat exchangers has been preferred supplier in many different geographies from Middle East to Scandinavia and from Europe to Africa. Termokar, of which fundamental principle is to provide customer- based work and high quality competitve product, carries out its production activities in accordance with ISO 9001-:2008 standards and has Eurovent Certification.

KARMAK

The mission of Karmak, which combines its expertise and experience in the plastic injection molding sector, is to provide job opportunities to people who are prone to teamwork that can compete in the field of national and international fields of activity and to provide products and services that will meet customer requests at the highest level.

KAR CONSTRUCTION

The company group which makes investments today in different sectors such as construction, contracting, industry, hotel management and culture and arts. It has a 66 year history. It aims to be noticed and to be different by making a difference. It builds stylish, comfortable, luxurious residences and businesses.

Strategic Direction

Our Mission

To empower mission-critical industries with exceptionally engineered, intelligent and sustainable power infrastructure solutions.

Our Vision

To become the world’s most trusted partner in energy infrastructure engineering, recognized globally for innovation, resilience and safety.
“We don’t simply supply auxiliary equipment. We engineer the interfaces between them.”