Exhaust Gas System with SCR

In Short

AXON Technic supplies exhaust gas systems with SCR for diesel generator sets, combining the silencer and the aftertreatment that reduces NOx emissions. They are used where the emission limits of the site or the country call for cleaner exhaust.

AXON exhaust gas systems with SCR lead the exhaust of diesel and gas generator sets safely away from the engine and reduce its emissions where the site has emission limits, including data centers.

Each exhaust system is made for its engine and its site, complete with the silencer and everything between the engine and the stack.

Exhaust Gas System with SCR

Technical Documentation

Other Products