Circuit Breaker Panel

AXON circuit breaker panels distribute and protect the power of generator sets and their auxiliary equipment, for safe operation in normal service and in a fault.

Each panel is made for its project and works together with the generator controls, the auxiliary MCC cabinets and the transfer switches of the plant.

Circuit Breaker Panel

Technical Documentation

Other Products