In Short
AXON Technic is a load bank supplier for generator testing. Its resistive and resistive-reactive load banks are used for factory tests, commissioning and the routine exercise of standby generator sets, on site or as permanent installations, for data centers, hospitals and power plants.
A load bank tests a generator set at load without connecting it to the building. AXON load banks are used for commissioning, periodic generator testing and maintenance, and for data center backup power checks.
Each load bank is made for its project, for testing on site or as a permanent installation, and built for safe and reliable operation.