AXON Oil Supply Systems are engineered to ensure a reliable and continuous supply of lubricating oil for diesel and natural gas generator engines. Designed for both standby and continuous-duty applications, the system provides efficient oil storage, filtration, circulation, and transfer while maintaining the required pressure and flow to protect critical engine components.
Each Oil Supply System is custom-designed according to engine specifications, oil capacity, operating conditions, and project requirements. The system may include storage tanks, transfer pumps, filtration units, pressure control equipment, valves, instrumentation, piping, and monitoring devices to deliver a complete and dependable lubrication solution.
Manufactured from high-quality carbon steel or stainless steel, AXON Oil Supply Systems offer excellent durability, corrosion resistance, and long service life. The modular design allows easy installation, simplified maintenance, and seamless integration with generator packages and plant control systems while complying with international engineering standards.