Auxiliary MCC (Motor Control Center) Cabinets are designed to provide centralized control, protection, and power distribution for all auxiliary electrical equipment associated with generator systems. The cabinet ensures reliable operation of cooling fans, water pumps, fuel transfer pumps, ventilation systems, lighting, heaters, and other auxiliary loads through an integrated motor control and protection system.
Each Auxiliary MCC Cabinet is custom-engineered according to the project’s electrical architecture, motor ratings, control philosophy, and operational requirements. The modular design allows seamless integration with generator control panels, circuit breaker panels, Building Management Systems (BMS), and SCADA systems, providing safe, efficient, and fully coordinated operation.
Manufactured with heavy-duty steel enclosures and premium electrical components, AXON Auxiliary MCC Cabinets are suitable for indoor and outdoor installations. Every cabinet is designed to deliver high reliability, simplified maintenance, and long service life while complying with international electrical standards.