AXON Air Inlet Hoods are designed to provide efficient fresh-air intake for generator enclosures while protecting the ventilation system against rain, snow, dust, and foreign objects. Engineered for low airflow resistance, they ensure optimum cooling air supply without compromising engine performance or increasing pressure loss.
Manufactured from heavy-duty galvanized or stainless steel, Air Inlet Hoods are suitable for the most demanding indoor and outdoor applications. Their aerodynamic louver design minimizes water ingress while maintaining uniform airflow distribution throughout the enclosure. Each unit can be customized to match the required airflow capacity, installation layout, and environmental conditions.