AXON Daily Fuel Tanks are designed to provide a reliable and uninterrupted fuel supply for diesel generator sets by maintaining an adequate quantity of fuel close to the engine. Serving as an intermediate storage tank between the main fuel tank and the engine, the system ensures stable fuel delivery, reduces fuel transfer interruptions, and enhances overall generator reliability during standby, prime, and continuous-duty operation.
Each Daily Fuel Tank is custom-engineered according to engine fuel consumption, required operating autonomy, project specifications, and installation constraints. The system can be equipped with level gauges, level switches, fuel transfer pumps, overflow protection, vent connections, drain valves, leak detection, and monitoring instrumentation to provide safe and efficient fuel management.