Dummy Load Bank

AXON Dummy Load Banks are designed to simulate electrical loads for testing, commissioning, and maintenance of diesel and natural gas generator sets without connecting the generator to the actual facility load. By applying a controlled electrical load, the system verifies generator performance, cooling efficiency, voltage regulation, frequency stability, and engine operation under real operating conditions.

Engineered for continuous and reliable operation, AXON Dummy Load Banks are available in resistive and combined resistive/reactive configurations with customizable power ratings and voltage levels to meet project-specific requirements. The robust construction, advanced control system, and efficient cooling design ensure safe operation in demanding industrial environments.

Technical Documentation

Other Products