Belly Tank Generators in the UK and Europe

In Short

A belly tank generator carries its fuel in a tank built into its own base frame. In the UK and across Europe belly tanks are the usual choice for outdoor, containerised and rental sets, because the set arrives with its fuel reserve and its spill protection in one package, and because the rules on oil storage and water protection are easiest to meet with a double-walled tank under the set. Send AXON the engine data, the running time the site needs and the country, and AXON prepares the belly tank proposal.

Walk past the generator sets behind European supermarkets, hospitals, telecom huts and building sites and you will notice that most of them stand on their fuel. The belly tank generator is the normal arrangement in the UK and on the continent, much more than a separate tank beside the set. Belly tanks suit the way European sites are laid out and the way the rules on storing oil are written. This guide explains in plain words why that is, what the rules expect of the tank, and what is worth settling before a set or a tank is ordered.

Why European Sites Choose a Belly Tank Generator

Space is the first reason. European sites are often small: a service yard in a town centre, a corner of a car park, a roof, a strip of ground beside a substation. A separate fuel tank needs its own base, its own containment, pipework to the engine and often its own approval. A belly tank keeps the fuel inside the footprint of the set, so the whole installation is one object on one foundation.

The hire market is the second. Rental sets for construction, events, utilities and emergency cover move from site to site every few weeks, and nobody wants to install a tank each time. With belly tanks the fuel travels with the machine, the set is set down, filled and started, and it leaves again without groundwork.

Oil Storage and Water Protection Rules

Across Europe diesel is treated as a substance that can pollute soil and water, and a tank that holds it is expected to have a second line of defence: a second wall or a bund that catches whatever leaks from the first. In England this comes from the oil storage regulations, and Scotland, Wales and Northern Ireland have their own versions. In Germany diesel is classed as hazardous to water, and larger installations have to be notified and checked by approved inspectors. Most other countries follow a similar idea under their own names.

A double-walled belly tank with leak detection in the space between the walls meets that idea in the simplest way, because the containment is built into the set and watched by the controller. Where the site is near a river, a well or a drinking water protection area, the authority looks more closely, and it is better to know that before the tank is built than after.

Spill Protection When the Tanker Arrives

Most fuel that ends up on the ground at a generator is spilt during filling, not lost through a failed tank. A belly tank for a European site is therefore specified with the delivery in mind: overfill protection that the driver can rely on, a filling point the tanker hose can actually reach, and a vent that cannot blow fuel out when the tank is full.

A lockable filling cabinet with its own small drip containment is common on rental sets and on sites open to the public, partly for spills and partly because fuel theft from unattended sets is a real problem. On sets that will be fed from a larger tank during long hires, external fuel connections let that be done without opening the belly tank at all.

Permits, Inspections and the Paperwork

A permanent installation may be seen by more than one authority: planning or building control for the set, the fire authority for the fuel and the environmental authority for the storage, with the insurer asking its own questions. Fire rules for fuel inside buildings can limit what may stand in a plant room, which is one of the few places where a belly tank is sometimes replaced by a small day tank.

What the authorities usually want to see is simple: proof that the tank is tight, that the second wall or bund is there, and that leaks and high levels raise an alarm someone will notice. In some countries the tank is inspected again at intervals. Send AXON the engine data, the running time the site needs, the country and whether the set stays or moves, and AXON prepares the belly tank with the documents that the local rules ask for.

What this guide covers

  • Why belly tank generators are the usual arrangement in the UK and Europe
  • Small urban sites and the hire market
  • Oil storage and water protection rules and the need for a second wall or bund
  • Leak detection and alarms on a double-walled belly tank
  • Spill protection, overfill protection and security at the filling point
  • Permits, inspections and the documents authorities ask for

What to send with an enquiry

  • Engine model and the engine data sheet
  • The running time the site needs without a fuel delivery
  • Country and type of site, and whether the set is permanent or for hire
  • Any requirement from the environmental, fire or planning authority
  • Whether the site is near water, a well or a protection area
  • How the set is refuelled: by tanker at the set or from a larger tank

Questions we are often asked

What is a belly tank generator?

A generator set whose fuel tank is built into its base frame, so the engine and alternator stand on the fuel and the set carries its own reserve with no separate tank.

Why are belly tanks so common in the UK and Europe?

Because sites are often small, the hire market is large and the rules on oil storage are easiest to meet with a double-walled tank under the set. The fuel and its containment arrive as one package.

Does a belly tank need a bund in the UK?

Oil storage rules expect secondary containment. A double-walled belly tank provides it with its outer wall; a single-walled tank needs a bund or a containment tray around it.

Are belly tanks allowed inside buildings?

It depends on the local fire rules. Some limit the fuel that may stand in a plant room, and then a small day tank near the engine with storage outside is the usual answer.

What does AXON need to propose a belly tank for a European site?

The engine data, the running time without refuelling, the country and site, and any authority requirement. AXON prepares the belly tank proposal for generator sets of any make.