Custom Day Tanks for Generators: When a Standard Tank Does Not Fit

In Short

A custom day tank is a day tank for a diesel generator that is built for one particular plant room, engine and fuel system rather than taken from a catalogue. It is chosen when the space, the access route, the position of the bulk tank, the number of sets or the local fire and storage rules rule out a standard tank. Send AXON the engine data, a drawing or photos of the room and the fuel arrangement, and AXON designs the day tank to fit.

Most day tanks for diesel generators are ordered from a standard range and work perfectly well. The trouble starts when the plant room was drawn before anyone thought about the fuel, when the only way in is a stairwell, or when one tank has to look after more than one engine. Then the standard tank is the wrong shape, the wrong size or has its connections on the wrong side, and the installer ends up building the system around the tank instead of the other way round. Custom day tanks exist for those sites. This guide describes the situations where we see them most often and what is worth deciding before one is ordered.

The Room Decides the Shape

A standard tank is a box of a fixed shape. Plant rooms are not. Basements have beams, ducts and cable trays in the way, rooftop rooms have sloping ceilings, and the space left beside the engine is often long and narrow or tucked into a corner. A custom day tank is made to use the space that is actually there, so that the set, the tank and the people who service them all fit.

Service access is the part that gets forgotten. Someone has to read the level, check the bund, open the inspection cover and get at the connections. A tank that fits the room but blocks the engine door or the cooling air is not a good fit.

Getting the Tank Into the Building

More day tanks are held up by the way into the room than by the room itself. Doors, corridors, goods lifts and stair turns on an existing building can be smaller than anything in a catalogue. Measure the route, not only the room.

Where the route is tight, the tank can be made in a slimmer shape, split into more than one vessel connected on site, or built so that it can be brought in through an opening that already exists. That is easier to plan at the start than to discover with the tank standing in the car park.

One Day Tank for a Diesel Generator, or One for Several

On a single set the day tank is a simple job. On a site with several generators, a shared bulk tank and duty and standby supply, the day tank becomes part of a larger fuel system, and its arrangement has to match the way the sets start, run and back each other up. Data centers, hospitals and industrial plants often fall into this group.

Here the custom work is less about shape and more about how the tank is connected and controlled: where the fuel comes in and goes out, how it reports to the generator controls and the building management system, and what happens if one part of the supply fails. Getting that right on paper first saves a lot of rework at commissioning.

Old Buildings, New Rules and Replacements

Replacing a day tank in an existing building is a common reason to go custom. The new tank has to meet today's fire and oil storage rules, connect to pipework that is already in the wall, and often stand on the same plinth as the old one. Fire rules for fuel inside buildings, and the insurer's own requirements, frequently decide how much fuel may be kept in the room and what the tank must be enclosed in.

AXON builds custom day tanks and belly tanks for generator sets of any make, alone or as part of a complete fuel system. Send the engine data, a drawing or photos of the room and the access route, and a short description of how the fuel reaches the set, and AXON designs the tank to fit.

What this guide covers

  • When a standard day tank for a diesel generator is not enough
  • Plant rooms with awkward shapes, obstructions and limited service space
  • Narrow access routes into existing buildings
  • Day tanks serving several generator sets on a shared fuel system
  • Connection to generator controls and building management
  • Replacements in older buildings under current fire and storage rules

What to send with an enquiry

  • Engine model and the engine data sheet, and the number of sets
  • A drawing or photos of the plant room with the space available
  • The access route into the building: doors, stairs and lifts
  • Where the bulk tank stands and how the fuel reaches the room
  • Any requirement from the fire authority, the insurer or the local storage rules
  • For a replacement: photos of the existing tank and its connections

Questions we are often asked

What is a custom day tank?

A day tank for a generator that is designed for one site, its room, its access route and its fuel system, instead of being chosen from a fixed standard range.

When does a generator need a custom day tank instead of a standard one?

When the room is an awkward shape, the access route is too small, several sets share one fuel system, or local fire and storage rules ask for something a standard tank does not offer.

Can a day tank be brought into a building through a small door or stairwell?

Often, yes. It can be made in a slimmer shape or split into connected parts. Measure the whole route before the tank is ordered.

Can one day tank feed more than one diesel generator?

It can, but then the tank is part of a shared fuel system and its arrangement has to match how the sets run and back each other up. That is a case for a custom design.

What does AXON need to design a custom day tank?

The engine data, the number of sets, a drawing or photos of the room and the access route, and how the fuel reaches the set. AXON designs the day tank for generator sets of any make.