Exhaust Silencers for Dual-Fuel, Gas and HVO-Fuelled Generator Engines

In Short

An exhaust silencer for a dual-fuel, gas or HVO-fuelled generator does the same job as on a diesel set, but the fuel changes what the exhaust carries, how wet it is and how the engine is run. The generator exhaust silencer should be chosen for every fuel the engine may burn over its life, not only the one it starts on. Tell AXON the fuels and the running pattern and AXON selects the silencer to suit.

A question we hear more often now: the set will run on HVO, or on gas with diesel as a back-up, so does the exhaust silencer need to be any different? Sometimes the answer is no. Sometimes it is the point that decides whether the generator exhaust silencer lasts its full life. The fuel changes what reaches the silencer, and many plants change fuel at least once over the years. This guide explains in plain words what to think about for dual-fuel, gas and HVO-fuelled engines, and it applies equally to what American buyers call a generator muffler.

One Engine, More Than One Fuel

A dual-fuel engine burns gas with a small amount of diesel to light it, and can usually fall back to diesel alone when the gas supply stops. The engine is the same, but its exhaust is not. On gas it is cleaner and wetter; on diesel it carries more soot. The silencer sees both, sometimes in the same week.

That is why the silencer on a dual-fuel set is chosen for the harder of the two duties, and for the change between them. A unit that suits only one fuel tends to show it in the other: soot building up in a lining that was never meant for diesel running, or rust from moisture that a diesel-only design did not expect.

What HVO Changes for a Generator Exhaust Silencer

HVO is a renewable diesel made from waste fats and oils, and most modern diesel engines can burn it without changes. Data centers and public buildings are moving to it to cut their emissions, and the question of the silencer comes with the switch.

In most cases a silencer that suits the engine on diesel also suits it on HVO. The exhaust tends to be cleaner, so soot is less of a worry, though the noise of the engine does not change in any way a neighbour would notice. What is worth checking is the running pattern that often comes with the change: sets moved to HVO are sometimes run more often or for longer test periods, and that matters for drains, condensate and the lining more than the fuel itself does.

Gas Engines and the Moisture Question

A generator running on natural gas or biogas makes an exhaust with more water in it than a diesel set. When that gas cools, inside the silencer or after a stop, the water condenses, and with biogas in particular it is not clean water. The material of the shell and internals, the drains and the position of the silencer in the pipe all follow from this.

Our guide on gas engines and CHP plants goes further into heat recovery and treatment stages. For a plain gas generator without those, the point is simpler: tell the supplier it is gas, and which gas, before the silencer is chosen.

Planning for a Fuel Change Later

Many sets are bought for diesel today with a plan to move to HVO or to dual-fuel running in a few years. If that is on the table, say so at the start. A silencer chosen with the later fuel in mind costs little more than one chosen for today, while changing a silencer that turns out unsuitable means cranes, pipe work and down time.

AXON supplies exhaust silencers for diesel, gas, dual-fuel and HVO-fuelled generator engines, as single units or as part of the complete exhaust system. Send us the engine, the fuels it will burn now and later, and how it will run, and AXON does the selection and the calculation behind it.

What this guide covers

  • How the fuel changes what the exhaust carries to the silencer
  • Choosing a silencer for both duties of a dual-fuel engine
  • What switching a diesel set to HVO means for the generator exhaust silencer
  • Moisture and condensate on natural gas and biogas engines
  • Why a later fuel change should be named in the first enquiry
  • Where to read more about gas engines with heat recovery

What to send with an enquiry

  • Engine make and model, or the set rating
  • Every fuel the engine will burn: diesel, HVO, natural gas, biogas or dual-fuel
  • Any fuel change planned for later years
  • Standby, prime or continuous running, and how often the set is tested
  • The noise limit or permit condition, if there is one
  • Where the set stands and the route of the exhaust pipe
  • Whether an existing silencer is to be kept or replaced

Questions we are often asked

Does a generator running on HVO need a different exhaust silencer?

Usually not. A silencer that suits the engine on diesel normally suits it on HVO. It is worth checking the running pattern, because sets moved to HVO are often run more, and that affects drains and condensate.

What is different about a silencer for a dual-fuel engine?

It has to cope with two kinds of exhaust: the cleaner, wetter gas exhaust and the sootier diesel exhaust when the engine falls back to diesel. It is chosen for both.

Why does gas exhaust matter for the silencer?

Gas exhaust carries more water, which condenses when the gas cools. With biogas the condensate is aggressive, so the material, drains and position of the silencer are chosen with that in mind.

Should I mention a future fuel change when I order?

Yes. Choosing the silencer for the later fuel at the start costs little, while replacing an unsuitable one later means lifting, pipe work and down time.

Is a generator muffler the same thing?

Yes. Muffler is the American name for the same part, and the same points apply on every fuel.