In Short
AXON Technic supplies exhaust silencers for Caterpillar diesel generator sets and gas engines, from industrial to hospital grade. Each silencer is chosen for the sound limit of the site, matched to the engine and its exhaust route, and can be combined with SCR where emission limits apply.
Caterpillar sets carry backup power for data centers and hospitals and prime power for mines and remote sites. Wherever they run near people, the exhaust silencer is one of the parts that decides whether the site meets its sound limit.
Data Centers and Hospitals
Backup sets are tested regularly, often near offices and homes. A silencer of the right grade keeps those tests within the sound limit of the site.
Prime Power Sites
Sets that run day and night need a silencer built for long service, with drains and access for inspection.
Gas Engines and CHP
Gas engines in power plants and CHP plants have their own exhaust needs, and the silencer is chosen for them and for the place it stands.
Silencer and SCR in One Line
Where emission limits apply, the silencer and the SCR system are planned together as one exhaust line.
What AXON Technic supplies
- Exhaust silencer chosen for the sound limit of the site
- Matched to the engine and its exhaust route
- Residential, critical or hospital grade as the site needs
- SCR exhaust systems where emission limits call for them
- Supports, connections and documentation with every unit
What to send with an enquiry
- The engine or generator set type and how many sets the site has
- The sound limit and where it is measured
- Where the silencer will stand: on the container, on the roof or in a plant room
- Any emission limit the site must meet
- The engine maker's exhaust data, if you have it
Questions we are often asked
Do you supply silencers for Caterpillar 3500 and C175 sets?
Yes. Each silencer is chosen for the engine and the site.
Do you supply silencers for Caterpillar gas engines?
Yes, including exhaust lines for CHP and power plants.
Is AXON Technic part of Caterpillar?
No. AXON Technic is an independent supplier. Caterpillar and Cat are trademarks of Caterpillar Inc. and are used here only to name the engines our silencers serve.
What do you need for a quotation?
The engine type, the sound limit and where it is measured, where the silencer will stand and any emission limit. With that AXON Technic prepares the proposal.