In Short
Reactive silencers remove low-frequency rumble by reflecting sound inside chambers, absorptive silencers remove higher-frequency hiss with sound-absorbing material, and combined silencers do both. The type is chosen by the noise the engine produces and the back pressure it can accept, and it is the first step in choosing an exhaust silencer.
An exhaust silencer is chosen by its type before anything else, because the type decides which part of the engine's noise it removes. A diesel generator exhaust has a low rumble from the firing pulses and a long tail of hiss and flow noise. No single design handles both equally well. This guide explains how reactive, absorptive and combined silencers differ, what each costs in back pressure, and how to pick between them.
Reactive Silencers
A reactive silencer works with chambers and tubes. Inside the shell, the gas passes through chambers and perforated tubes, and part of the sound is reflected back towards the engine. The effect is strongest against the low rumble, where most of the engine's sound energy sits.
There is no absorbing material in a reactive silencer, so it does not clog with soot, does not wear and does not mind how hot the gas is. The price is that it works best on some pitches and less on others, and it resists the gas flow more than a straight-through design because the gas is forced through the chambers.
Absorptive Silencers
An absorptive silencer is a straight perforated tube wrapped in a sound-absorbing material inside a shell. The sound passes into the material, where it is turned into a little heat. It works well against the hiss, and because the gas path is open and straight, it resists the flow very little.
Its weak side is the low rumble, and the absorbing material itself. It has to survive the exhaust heat and a gas stream that carries soot and sometimes unburnt oil, and an engine that runs for long periods at light load can coat it with soot and lose effect. For that reason absorptive designs are built with the material protected and suited to the duty.
Combined Silencers
Most generator silencers above the industrial grade are combined: reactive chambers take the rumble and an absorptive section takes the rest, in one shell. The two principles cover each other's weakness, which is why the residential, critical and hospital grades are built this way. A combined silencer is longer and heavier than either principle alone, and it resists the flow somewhere between the two.
The result follows the grade rather than the type, from the industrial grade at the low end to the hospital grade at the top, and depends on the construction. What matters in the end is whether the site's limit is met where the engine is loudest.
Which Type Fits the Job
The choice follows from the sound limit, the available space and what the engine allows in back pressure. An open industrial site with a modest limit may be served by a single reactive or absorptive unit. A site close to neighbours, a hospital or a data center in a built-up area usually needs a combined silencer, often in two stages, with the sound of the pipe and shell itself - the breakout noise - controlled by insulation. The silencer is then checked together with the rest of the exhaust chain against the engine maker's back pressure limit.
AXON supplies exhaust silencers of every grade and type for generator sets of any make, alone or as part of a container or enclosure. Send the engine model, the sound limit and its distance, and the available space, and AXON prepares the proposal with the type and the expected result.
What the selection covers
- Silencer type: reactive, absorptive or combined, by the character of the engine noise
- Grade: industrial, residential, critical or hospital, by the sound limit
- Back pressure checked within the engine maker's limit
- Protection of the absorbing material in absorptive sections
- Insulation of shell and pipe against breakout noise
- Drains, flanges and supports for the mounting position
What to send with an enquiry
- Engine model, exhaust flow and exhaust temperature
- Sound limit and the distance at which it applies
- Back pressure limit of the engine
- Available space and the mounting position
- Running hours and typical load
- Ambient conditions and the corrosion class
Questions we are often asked
What is the difference between a reactive and an absorptive silencer?
A reactive silencer reflects sound with chambers and tubes and is best against the low rumble. An absorptive silencer turns sound into heat in an absorbing lining and is best against the hiss.
Which type resists the flow less?
The absorptive, straight-through design. Reactive silencers force the gas through chambers and lose more pressure.
Why is a combined silencer used for the higher grades?
Because an engine is loud in both the low and the high pitch. The reactive part takes the first and the absorptive part the second, so the unit can meet a strict limit.
Does the lining of an absorptive silencer wear out?
It can, if it is not protected or if the engine runs long at light load and soot coats it. A protected lining of the right material keeps its effect over the life of the unit.
Can I fit a larger silencer to quieten the engine more?
Up to the point where the pipe and shell noise dominate. Beyond that the breakout noise from the shell and the exhaust pipe sets the limit, and insulation is needed instead.
Products
Further reading
- Generator Exhaust Silencer Grades Explained: Industrial, Residential, Critical and Hospital
- Exhaust Back Pressure: Why the Silencer and the Pipe Route Decide Generator Output
- Diesel Generator Exhaust System Components: Silencer, SCR, Pipework
- Generator Noise Levels Explained: dB(A), Distance and How to Reduce Them