In Short
A containerized or rental generator set needs an exhaust silencer that travels with it: one that fits the container, survives being lifted and trucked from site to site, and is quiet enough for the strictest place the set may be sent to. Tell AXON how the set will be used and moved, and AXON chooses and builds the generator exhaust silencer to suit.
A rental generator may spend one month behind a factory, the next at an outdoor event and the one after that on a building site with flats on three sides. Its exhaust silencer goes everywhere with it. That single fact changes how the silencer on a containerized or rental generator set is chosen, mounted and built, and it is the subject of this guide. The same applies to what American fleets call a generator muffler.
A Silencer That Has to Travel
A silencer in a plant room is installed once and left alone. On a container or a rental set it is lifted by crane, loaded on a truck, shaken over bad roads and set down again, sometimes many times a year. The supports, the joints to the exhaust pipe and the shell itself have to take that treatment without cracking or working loose.
Many fleet owners also want the set to arrive ready to run. That usually means the generator exhaust silencer sits on or inside the container in a position that stays within the transport outline, and needs little or no work on site before the first start.
Choosing the Grade for the Next Site, Not the Last One
A fixed set is silenced for one site and one set of neighbours. A rental set does not know where it is going next. A unit fitted with an industrial grade silencer can be perfect on a quarry and a problem the week it is hired to a hospital or a residential street.
For that reason many fleet owners equip their containers with a higher grade exhaust silencer than the first job needs, so the set can be offered to more customers without a change. Others keep two versions in the fleet. Which way makes sense depends on the kind of work the fleet is hired for, and that is a question worth answering before the silencer is ordered.
Rain, Dirt and Rough Handling
A set that moves around stands in the open more often than not. The outlet needs protection against rain when the engine is stopped, and the silencer needs a way to drain the water and condensate that collect over standby periods. Mud, dust and the odd knock from a forklift come with the job as well, so the finish and the position of the silencer matter more than on a fixed installation.
The silencer is also part of how the container looks to the customer. A clean, well-fixed unit on the roof says something about the whole fleet; a rusty one held on with improvised brackets says the opposite.
How AXON Fits the Silencer to the Fleet
AXON builds exhaust silencers for containerized generator sets and for complete generator containers, so the silencer, its mounting and the container are designed together. Tell us the engine, the container type, how often the set is moved and what kind of customers it is hired to, and we will propose the silencer grade and arrangement that suits the fleet rather than one site.
If you already run a fleet with mixed silencers, say so. Bringing the units to one standard often makes hiring, spares and service simpler.
What this guide covers
- Why a silencer on a moving set is chosen differently from a fixed one
- How transport, lifting and road travel affect the silencer and its mounting
- Choosing a generator silencer grade for the strictest site the set may reach
- Rain protection, drains and finish for sets that stand in the open
- Why the silencer and the container are best designed together
- Bringing a mixed fleet to one silencer standard
What to send with an enquiry
- Engine make and model, or the set rating and fuel
- Container or enclosure type, or whether AXON should supply the container too
- How often the set is moved and how it is transported
- The kind of sites and customers the set is hired to
- The strictest noise requirement the set is expected to meet
- Whether the silencer must stay within the transport outline
- Number of sets in the fleet and any silencers already in use
Questions we are often asked
Is the silencer on a rental generator different from a fixed one?
It does the same job, but it has to survive lifting and road transport and suit sites that change from hire to hire. That affects the mounting, the build and the grade.
Which silencer grade should a rental fleet use?
It depends on where the sets are hired. Many fleets choose a higher grade than the first job needs so one set can serve more customers.
Can the exhaust silencer stay on the container during transport?
Usually yes, if it is planned that way from the start. Tell AXON the transport arrangement and the silencer is positioned to suit.
Is a generator muffler the same thing?
Yes. Muffler is the American name for the same part, and the same points apply to rental and containerized sets.
Can AXON supply the container and the silencer together?
Yes. AXON builds generator containers and exhaust silencers, and designing them together gives the best fit.
Products
Further reading
- Generator Exhaust Silencer Grades Explained: Industrial, Residential, Critical and Hospital
- Exhaust Back Pressure: Why the Silencer and the Pipe Route Decide Generator Output
- Generator Silencers: What Decides the Exhaust Silencer You Need
- Acoustic Enclosure, Container or Canopy: Which Housing for a Diesel Generator?
- Installing an Exhaust Silencer: Supports, Expansion and Drains