Exhaust Silencers for Cummins Generator Sets

In Short

AXON Technic supplies exhaust silencers for Cummins diesel and gas generator sets, from industrial to hospital grade, for data centers, hospitals, towns and industrial sites. Each silencer is chosen for the sound limit of the site and matched to the engine and its exhaust route.

Cummins generator sets stand in data centers, hospitals, factories and towns, and many of them are close to people. The exhaust silencer decides how much of the engine is heard outside, and it has to suit both the engine and the place.

The Right Grade for the Site

An industrial site may need only a basic silencer, while a hospital or a data center next to homes needs a much quieter one. AXON Technic chooses the grade for the sound limit of the site.

Matched to the Engine

The silencer is matched to the engine and the exhaust route, so the engine keeps its output while the exhaust becomes quiet.

On a Container, a Roof or in a Plant Room

Sets in containers often carry the silencer on the roof, sets in buildings in the plant room or on the roof above. The silencer is arranged for the place it will stand.

Exhaust Cleaning Where Required

Where emission limits apply, the silencer can be combined with an SCR exhaust system in one exhaust line.

What AXON Technic supplies

  • Exhaust silencer chosen for the sound limit of the site
  • Matched to the engine and its exhaust route
  • Residential, critical or hospital grade as the site needs
  • SCR exhaust systems where emission limits call for them
  • Supports, connections and documentation with every unit

What to send with an enquiry

  • The engine or generator set type and how many sets the site has
  • The sound limit and where it is measured
  • Where the silencer will stand: on the container, on the roof or in a plant room
  • Any emission limit the site must meet
  • The engine maker's exhaust data, if you have it

Questions we are often asked

Do you supply silencers for every Cummins generator set?

Yes. Each silencer is chosen for the engine and the site, from a single standby set to a plant with many sets.

Can you replace the silencer of an existing set?

Yes. Send us the set type, what you know about the existing silencer and the sound limit, and we propose the replacement.

Is AXON Technic part of Cummins?

No. AXON Technic is an independent supplier. Cummins is a trademark of Cummins Inc. and is used here only to name the engines our silencers serve.

What do you need for a quotation?

The engine type, the sound limit and where it is measured, where the silencer will stand and any emission limit. With that AXON Technic prepares the proposal.

Products

Further reading