Exhaust Silencers for Jenbacher Gas Engines

In Short

AXON Technic supplies exhaust silencers for INNIO Jenbacher gas engines in CHP plants, greenhouses, power plants and data centers. Each silencer is chosen for the sound limit of the site and for a gas engine exhaust that runs for long hours, and it is planned together with heat recovery and catalysts in the same exhaust line.

Jenbacher gas engines often run for long hours in CHP plants close to towns, greenhouses and hospitals. Their exhaust lines carry heat recovery, catalysts and the silencer, and all of them have to work together.

One Exhaust Line

The silencer is planned with the exhaust heat exchanger and the catalyst, so the line works as a whole and the engine keeps its output.

Long Running Hours

A CHP engine runs far more hours than a standby set, so the silencer is built for long service, with drains and access for inspection.

Close to Towns

Many CHP plants stand near homes. The silencer grade is chosen for the sound limit of the site from the start.

Data Center Gas Engines

Data centers that make their own power with gas engines need quiet exhaust lines for engines that run every day.

What AXON Technic supplies

  • Exhaust silencer chosen for the sound limit of the site
  • Matched to the engine and its exhaust route
  • Residential, critical or hospital grade as the site needs
  • SCR exhaust systems where emission limits call for them
  • Supports, connections and documentation with every unit

What to send with an enquiry

  • The engine or generator set type and how many sets the site has
  • The sound limit and where it is measured
  • Where the silencer will stand: on the container, on the roof or in a plant room
  • Any emission limit the site must meet
  • The engine maker's exhaust data, if you have it

Questions we are often asked

Do you supply silencers for every Jenbacher engine type?

Yes. Each silencer is chosen for the engine and the plant.

Can the silencer be combined with exhaust heat recovery?

Yes. The silencer is planned with the heat exchanger and catalyst in the same exhaust line.

Is AXON Technic part of INNIO?

No. AXON Technic is an independent supplier. Jenbacher is a trademark of INNIO and is used here only to name the engines our silencers serve.

What do you need for a quotation?

The engine type, the sound limit and where it is measured, where the silencer will stand and any emission limit. With that AXON Technic prepares the proposal.

Products

Further reading