In Short
AXON Technic supplies exhaust silencers for MTU diesel and gas generator sets, in particular for data centers and hospitals where the sets are tested near offices and homes. Each silencer is chosen for the sound limit of the site and matched to the engine and its exhaust route.
MTU sets are widely used for data center and hospital backup power. These sets are tested every month, often near offices and homes, so their exhaust silencers are chosen with care.
Many Sets, One Sound Limit
A data center with many sets has to meet one sound limit at its boundary. Every silencer is chosen so that all the sets together stay within it.
Matched to the Engine
The silencer is matched to the engine and its exhaust route, so the engine keeps its output.
On the Container Roof
Containerized sets usually carry the silencer on the roof, arranged with the radiator and the air openings so the container stays compact.
Exhaust Cleaning Where Required
Where emission limits apply, the silencer can be combined with an SCR exhaust system.
What AXON Technic supplies
- Exhaust silencer chosen for the sound limit of the site
- Matched to the engine and its exhaust route
- Residential, critical or hospital grade as the site needs
- SCR exhaust systems where emission limits call for them
- Supports, connections and documentation with every unit
What to send with an enquiry
- The engine or generator set type and how many sets the site has
- The sound limit and where it is measured
- Where the silencer will stand: on the container, on the roof or in a plant room
- Any emission limit the site must meet
- The engine maker's exhaust data, if you have it
Questions we are often asked
Do you supply silencers for MTU Series 2000 and Series 4000 sets?
Yes. Each silencer is chosen for the engine and the site.
Can the silencers for a whole data center be supplied together?
Yes. The silencers for all the sets are chosen together for the sound limit of the site.
Is AXON Technic part of MTU or Rolls-Royce?
No. AXON Technic is an independent supplier. MTU is a trademark of Rolls-Royce Power Systems and is used here only to name the engines our silencers serve.
What do you need for a quotation?
The engine type, the sound limit and where it is measured, where the silencer will stand and any emission limit. With that AXON Technic prepares the proposal.