Exhaust Silencers for Perkins Generator Sets

In Short

AXON Technic supplies exhaust silencers for Perkins diesel generator sets, from industrial to residential and hospital grade, for buildings, telecom sites, hospitals and industry. Each silencer is chosen for the sound limit of the site and matched to the engine and its exhaust route.

Perkins engines power a great many standby and prime generator sets, often in towns, beside office buildings and at hospitals. In these places the exhaust silencer is chosen first for the people who live and work nearby.

Quiet Enough for the Neighbours

Residential and hospital grade silencers bring the exhaust down to a level that suits homes, offices and wards.

Inside Enclosures and Plant Rooms

Sets in acoustic enclosures and plant rooms need a silencer arranged for the space, with the exhaust led out where it disturbs no one.

Matched to the Engine

The silencer is matched to the engine and the exhaust route, so the engine keeps its output.

Replacement Silencers

An old or corroded silencer can be replaced by a new one chosen for the same set and site.

What AXON Technic supplies

  • Exhaust silencer chosen for the sound limit of the site
  • Matched to the engine and its exhaust route
  • Residential, critical or hospital grade as the site needs
  • SCR exhaust systems where emission limits call for them
  • Supports, connections and documentation with every unit

What to send with an enquiry

  • The engine or generator set type and how many sets the site has
  • The sound limit and where it is measured
  • Where the silencer will stand: on the container, on the roof or in a plant room
  • Any emission limit the site must meet
  • The engine maker's exhaust data, if you have it

Questions we are often asked

Do you supply silencers for every Perkins generator set?

Yes. Each silencer is chosen for the engine and the site.

Can you supply a quieter silencer for an existing set?

Yes. Send us the set type and the sound limit, and we propose a silencer of the right grade.

Is AXON Technic part of Perkins?

No. AXON Technic is an independent supplier. Perkins is a trademark of its owner and is used here only to name the engines our silencers serve.

What do you need for a quotation?

The engine type, the sound limit and where it is measured, where the silencer will stand and any emission limit. With that AXON Technic prepares the proposal.

Products

Further reading