Exhaust Silencers for Volvo Penta Generator Sets

In Short

AXON Technic supplies exhaust silencers for Volvo Penta diesel generator sets, from industrial to residential and hospital grade, for buildings, rental fleets, telecom sites and industry. Each silencer is chosen for the sound limit of the site and matched to the engine and its exhaust route.

Volvo Penta engines drive many standby and rental generator sets that move from site to site or stand beside buildings. Their silencers have to suit compact enclosures and the sound limits of busy places.

Compact Enclosures

Sets in compact enclosures and containers need a silencer arranged for a small space, with the exhaust led out safely.

Quiet Enough for the Site

Residential and hospital grade silencers bring the exhaust down to a level that suits homes, offices and events.

Matched to the Engine

The silencer is matched to the engine and the exhaust route, so the engine keeps its output.

Rental and Moving Sets

Sets that travel need a silencer that stands up to transport and lifting, and is easy to inspect between jobs.

What AXON Technic supplies

  • Exhaust silencer chosen for the sound limit of the site
  • Matched to the engine and its exhaust route
  • Residential, critical or hospital grade as the site needs
  • SCR exhaust systems where emission limits call for them
  • Supports, connections and documentation with every unit

What to send with an enquiry

  • The engine or generator set type and how many sets the site has
  • The sound limit and where it is measured
  • Where the silencer will stand: on the container, on the roof or in a plant room
  • Any emission limit the site must meet
  • The engine maker's exhaust data, if you have it

Questions we are often asked

Do you supply silencers for every Volvo Penta generator set?

Yes. Each silencer is chosen for the engine and the site.

Can you supply silencers for a rental fleet?

Yes. Silencers for a fleet can be chosen together so the sets meet the sound limits of the sites they go to.

Is AXON Technic part of Volvo Penta?

No. AXON Technic is an independent supplier. Volvo Penta is a trademark of AB Volvo and is used here only to name the engines our silencers serve.

What do you need for a quotation?

The engine type, the sound limit and where it is measured, where the silencer will stand and any emission limit. With that AXON Technic prepares the proposal.

Products

Further reading