In Short
Fuel polishing systems keep the diesel stored for data center generators clean and dry while it waits to be used. A data center holds a large fuel reserve that is hardly ever burned, so the fuel ages in the tank, and data center fuel polishing is what keeps it fit for the day the sets have to carry the site. Send AXON the tank arrangement, the number of sets and the fuel used, and AXON prepares the fuel polishing proposal.
A data center buys diesel in the hope of never using it. The tanks are filled at handover, the sets are run for their regular tests, and the rest of the fuel stays where it is, sometimes for years. That is a long time for diesel. Fuel polishing systems are fitted so that the reserve is still good fuel on the one day it is called on. This guide explains why data center fuel polishing is asked for, what the system does for the site and what is worth settling while the fuel system is still on paper.
A Fuel Reserve That Is Almost Never Burned
On most generator sites the fuel is used and replaced, and fresh deliveries keep the tank contents young. A data center is the opposite case. The reserve is sized for a long outage, the grid is reliable, and the test runs burn only a small part of what is stored. Most of the fuel in the tanks is the same fuel that was delivered long ago.
Stored diesel does not stay as it was delivered. Moisture finds its way into the tank, dirt settles, and growth can start where water and fuel meet. None of it is visible from outside, and a short test run may not show it either. It shows when the sets have to run for hours on end, which is the one moment a data center cannot afford a fuel problem.
What Fuel Polishing Systems Do for the Site
A fuel polishing system takes the stored fuel out of the tank at intervals, cleans it, takes the water out and puts it back. It works on its own schedule, whether the generators run or not, so the fuel is looked after during all the months when nothing else on the fuel system moves.
It should not be confused with the filters on the engine. Those protect the engine from whatever reaches it, and they block quickly when the tank is dirty. Polishing looks after the tank itself, so that the engine filters have an easy job when the sets start. The system also tells the operator what it finds, and water or dirt turning up in the fuel is useful news long before an outage.
Many Tanks and Redundant Fuel Paths
A single standby set has one tank and one simple question. A data center has bulk storage, day tanks or belly tanks at the sets, and a fuel system laid out so that the loss of one part does not stop the others. The polishing has to respect that layout. A system that joins tanks which were meant to stay independent can carry a problem from one to the next, and that is the point most fuel specifications miss.
How many tanks one system looks after, how it is kept from linking separate fuel paths and how it is serviced without taking a set out of readiness are decided together with the fuel system, not added at the end. On a campus that grows hall by hall, it also helps to plan from the start how later tanks will be brought in.
What Operators, Auditors and Insurers Ask For
Data center operators usually have their own standard for stored fuel, and customers, auditors and insurers ask to see that it is followed. In practice that means regular fuel samples, a record that the polishing has run, and alarms that reach the building management system and a person who will act on them. A polishing system that runs quietly in a corner and reports to nobody does half the job.
The fuel matters too. Many sites are moving to renewable diesel or to blends with a bio content, and these do not all behave like conventional diesel in long storage, so say which fuel the site uses or plans to use. Existing sites can be fitted with polishing later, and for those a few photos of the tanks and their connections save a lot of questions. Send AXON the tank arrangement, the number of sets and the fuel, and AXON prepares the fuel polishing proposal for the site.
What this guide covers
- Why the diesel stored at a data center ages in the tank
- What a fuel polishing system does, and how it differs from the engine filters
- Sites with bulk tanks, day tanks and belly tanks
- Keeping redundant fuel paths independent
- Records, fuel samples and alarms that operators and auditors expect
- Renewable diesel and blended fuels, and retrofits on existing sites
What to send with an enquiry
- Number of generator sets and how the site is divided into halls or phases
- The tank arrangement: bulk tanks, day tanks and belly tanks, with their sizes
- A fuel system drawing or sketch showing which tanks belong together
- The fuel used today and any planned change of fuel
- The operator's fuel standard and the monitoring system the alarms should reach
- New build or existing site, with photos of the tanks for a retrofit
Questions we are often asked
Why do data center generators need fuel polishing?
Because the fuel reserve is large and almost never burned. The diesel stands in the tanks for a long time, collects water and dirt, and has to be kept clean so the sets can run through a long outage.
Is fuel polishing the same as the fuel filters on the engine?
No. The engine filters protect the engine from what reaches it. Fuel polishing systems clean the fuel in the tank itself, so the engine filters are not overloaded when the sets start.
Can one fuel polishing system serve several tanks?
Yes, and on a data center it usually does. It has to be arranged so that tanks and fuel paths meant to be independent stay independent.
Can fuel polishing be added to an existing data center?
In most cases, yes. The existing tanks and their connections decide how. Photos and a fuel system drawing are the best starting point.
What does AXON need to propose data center fuel polishing?
The number of sets, the tank arrangement with sizes, the fuel used and the monitoring system the alarms should reach. AXON prepares the proposal for generator sets of any make.
Products
- Fuel Polishing System for Diesel Tanks
- Day Tank (Daily Fuel Tank) for Generators
- Generator Belly Tank (Base Frame Fuel Tank)
Further reading
- Fuel Storage and Fuel Quality in Data Center Backup Power
- Standby Power for Data Centers: What the Generator Package Must Deliver
- What Is Fuel Polishing and Why Do Standby Generators Need It?
- Data Center Backup Generator Requirements: Ratings, Redundancy, Fuel, Noise and Emissions
- Fuel Tanks and Fuel Systems for Generator Sets