Industrial Exhaust Silencers for Gas Turbines and Process Plants

In Short

An industrial exhaust silencer for a gas turbine or a process plant does the same basic job as a generator exhaust silencer, but on a much larger gas stream, often for a plant that runs without stopping and sits inside a site with other noise rules and other equipment in the same duct. It is chosen with the stack, the heat recovery and the plant layout, not taken from a generator catalogue. Send AXON the machine data and the site requirement and AXON selects the silencer.

Most of this series is about the generator exhaust silencer on a reciprocating engine. Industrial plants raise a different set of questions. A gas turbine driving a generator or a compressor, a large engine in a pumping station, or a process unit that releases hot gas to the atmosphere all need an industrial exhaust silencer, and the first mistake is to treat it as a generator silencer, only bigger. The principle is the same; almost everything around it is not.

A Turbine Exhaust Is Not an Engine Exhaust

A reciprocating engine pushes out its gas in pulses, and its silencer is built mainly against the low rumble those pulses make. A gas turbine releases a far larger, steady stream of hot gas. Its noise has a different character, with more of the energy in the middle and upper pitches and a roar that carries a long way across open ground. A unit that silences a diesel generator well can do surprisingly little against it.

The turbine is also far less tolerant of resistance in its exhaust. Anything placed in the duct costs output and fuel for as long as the machine runs, so the silencer is laid out to treat the noise while disturbing the flow as little as possible.

Part of the Stack and the Duct

On a turbine or a large process unit the silencer is rarely a separate drum on a pipe. It is usually a section of the exhaust duct or the stack itself, built into a rectangular or round casing that may be taller than a house. Where the plant recovers heat from the exhaust, the silencer shares the path with the heat recovery boiler, a bypass stack and the dampers that switch between them, and each of these changes what the silencer has to deal with.

That is the main reason an industrial exhaust silencer is specified with the plant layout in hand. Its position before or after the heat recovery, the bypass arrangement and the space on the steel structure decide its form long before anyone talks about the grade.

Process Plants Have Their Own Sources

Refineries, chemical works, compressor stations and similar plants carry other exhaust and vent noise besides the main machines: gas released through safety and blow-off vents, steam vents during start-up, the exhaust of standby generator sets and fire pump engines. Some run all the time, some only for minutes a year, and some only in an emergency. Each needs a silencer suited to its duty, and the short, very loud releases are often the ones that reach the neighbours.

Plant owners also have to think about the people inside the fence. Operators work close to the equipment day and night, and on many sites the noise limit for work areas matters as much as the one at the boundary.

Built to Run for Years Between Stops

A standby generator silencer may run for a few hours a year. A turbine exhaust silencer on a process plant can run for years with only short planned shutdowns, and nobody wants to stop production to repair it. The materials, the way the internals are held in place and the protection of any absorbing lining are chosen for that long, hot duty and for the vibration of a large exhaust stream. Access for inspection during the planned shutdowns is part of the job as well.

AXON supplies industrial exhaust silencers alongside its generator silencers and mufflers. Send us the machine data, the exhaust layout and the noise requirement at the boundary and in the work areas, and AXON does the selection and the calculation behind it.

What this guide covers

  • How a gas turbine exhaust differs from a generator engine exhaust
  • Why the turbine accepts little resistance in its exhaust path
  • The silencer as part of the duct, the stack and the heat recovery
  • Vent, blow-off and standby engine silencers in process plants
  • Noise at the site boundary and in the work areas
  • Materials and access for long, continuous running

What to send with an enquiry

  • Type of machine: gas turbine, large engine, compressor drive or process vent
  • The machine data sheet with the exhaust data
  • Layout of the exhaust: duct, stack, heat recovery and any bypass
  • Noise requirement at the boundary and in the work areas
  • Running pattern: continuous, peak, start-up only or emergency
  • Site conditions and any plant standards for materials and access

Questions we are often asked

Can a generator silencer be used on a gas turbine?

Rarely. A turbine exhaust is a much larger, steady stream with a different noise character, and the turbine accepts little resistance. The silencer is designed for the turbine and its exhaust layout.

Where is the silencer placed on a gas turbine?

Usually in the exhaust duct or the stack itself. Where there is heat recovery, its position is chosen together with the boiler, the bypass stack and the dampers.

Do vents and blow-offs in a process plant need silencers?

Often yes. Short, very loud releases from safety, blow-off and steam vents are a common cause of complaints, and each is silenced for its own duty.

Why does continuous running matter for the silencer?

Because the plant may run for years between stops. Materials, internals and linings are chosen for that duty, and access is planned around the shutdowns.

Does AXON also supply generator silencers and mufflers for the same plant?

Yes. AXON supplies generator exhaust silencers and industrial exhaust silencers, so the standby sets and the main plant can be covered in one enquiry.

Products

Further reading