In Short
Keeping a standby generator ready means following a regular schedule of inspections and tests, because failures usually come from neglected basics such as batteries, fuel and coolant. Periodic load testing is the only way to prove the set will carry its load, and the enclosure needs attention as well.
A standby generator fails for boring reasons: a flat battery, fuel that went bad in the tank, a coolant leak nobody saw, a fan belt, a controller alarm that was acknowledged and forgotten. None of them is hard to prevent; all of them need a schedule and someone who follows it. This guide lists what a standby set and its enclosure need, how often, and which tests tell the truth about whether it will carry the load.
Weekly and Monthly: The Routine
Weekly, a walk round the set: coolant and oil levels, the battery charger on and the battery voltage right, no leaks under the engine or the tank, the controller showing no alarms, the fuel level and the day tank full, the enclosure doors, louvres and drains clear. Most plants run the set unloaded for a short time to prove the start - useful for the start, useless for the engine, which never warms up. Monthly, a longer run under load: the building load through the transfer switch or a load bank, enough to bring the engine to operating temperature and the exhaust to a temperature that burns off the deposits an unloaded run leaves behind.
Batteries, Coolant, Oil, Filters
Batteries are the first cause of failed starts: they are checked for voltage and electrolyte, the charger is checked for output, and they are replaced on a schedule rather than when they fail. The coolant is checked at the engine maker's intervals and changed when they say; the jacket-water heater keeps the engine warm for a fast start and is checked for function. Oil and filters are changed by hours or by time - a standby set that runs little still changes its oil regularly because it ages. Air filters, fuel filters and the fan belt are inspected and replaced at the maker's intervals; the exhaust system is checked for leaks and the rain cap for freedom.
Fuel: The Quiet Failure
Diesel that stands for months collects water, grows microbes and drops sediment, and the set that starts fine stalls an hour into the outage with blocked filters. The tank is kept full to reduce condensation, drained of water at the bottom, sampled and tested yearly, treated with additives for long storage, and - for bulk tanks that hold days of autonomy - cleaned continuously by a fuel polishing system. Fuel deliveries are checked for water before they go into the tank.
Load Bank Tests and the Enclosure
Once a year the set is run under load bank at its full rating for hours: it proves the engine, the alternator, the cooling and the fuel system under real conditions, and it burns off the deposits of a year of light running. Data centers and hospitals do it more often and under their own standards. The enclosure has its own list: silencer linings intact and dry, inlet and outlet louvres clear, door seals, fire detection tested, lighting and sockets, the earthing, corrosion on the casing and the fasteners, and the fuel tank's bund and leak sensor. AXON supplies the enclosures, fuel systems, exhaust and switchgear of generator packages with their maintenance documentation and the spare parts, and builds permanent load banks into its containers for sites that test on a schedule.
- Weekly: levels, battery and charger, leaks, alarms, fuel, enclosure openings
- Monthly: run under load to operating temperature
- Quarterly to yearly: oil and filters, belts, coolant test, battery test, fuel sample
- Yearly: full-load test under load bank, enclosure and silencer inspection, fire system test
- On a schedule: batteries; coolant and hoses at the maker's interval
In short
- Weekly walk-round, monthly run under load, yearly full-load test
- Batteries replaced on a schedule, charger and heater checked
- Coolant, oil and filters by time as well as by hours
- Fuel kept full, drained, sampled, treated and polished
- Load bank tests prove the set and prevent wet stacking
- The enclosure, silencers, fire system and tank bund have their own checks
What AXON can provide
- Maintenance documentation and spare parts for the enclosure, fuel and exhaust systems
- Permanent or portable load banks for scheduled testing
- Fuel polishing systems for existing tanks
- Replacement silencers, louvres and linings
- Upgrades: SCR, remote radiators, switchgear
- Inspection of existing enclosures on request
Questions we are often asked
How often should a standby generator be run?
A short start every week or two, a run under load to operating temperature every month, and a full-load test under load bank once a year. The engine maker's manual and the site's standard set the exact intervals.
What is wet stacking?
Unburnt fuel and carbon collecting in the exhaust and the cylinders of a diesel that runs unloaded or lightly loaded and never reaches its temperature. It shows as a wet, sooty exhaust and is burned off by running the set under load.
Why do batteries fail so often?
They age whether the set runs or not, chargers fail quietly, and a standby set asks a great deal of them at a cold start. Replacing them on a schedule and checking the charger regularly removes the most common cause of a failed start.
How long can diesel be stored?
Not as long as most people expect: without treatment, water, microbes and oxidation degrade it over months. Additives, a full tank, water draining and a polishing system extend it, and yearly sampling tells whether the fuel is still good.
Does the enclosure need maintenance?
Yes: silencer linings, louvres, door seals, fire detection, lighting, earthing, corrosion and the tank bund are inspected yearly, more often on a coast or a dusty site.